Paving a 6-Inch Concrete Overlay on Kansas Interstate 70
Koss Construction milled and paved a 6-inch bonded concrete on I-70 in 2011 for a total of 725,000 square yards and will continue work in 2012 for a total of 727,000 square yards
-
In 2011, Koss paved a total of 725,000 square yards. In 2012, Koss will pave a total of 727,000 square yards at a cost of $21.9 million.
- 1
- 2
- 3
- 4
Related Content
Resources
Related Terms
It is easier to achieve low smoothness numbers on the thinner 6-inch pavement because the paver is not pushing a big head of material. "You can push the small head of mud, and you are not extruding a lot of concrete either," Kennedy said.
- « Previous Page
- 1
- 2
- Next Page »

