Way back in early June we examined the term Lean Construction and recognized that Lean Construction is more than our efforts to run our companies as tight and smart as possible. Lean Construction is actually a proactive strategy of reducing many of the contributors to poor performance.

And while strategies associated with Lean Construction may very well lead a contractor to reduce expenditures on purchasing new equipment, the strategies are more directed at reducing every hurdle that prevents crews from producing great work the first time. At its heart, Lean Construction is about identifying and eliminating waste in the entire construction process, and we identified what I called the Seven Wastes:

Waste #1 – Overproduction

Waste #2 – Waiting

Waste #3 – Motion

Waste #4 – Transport

Waste #5 – Over-processing

Waste #6 – Inventory

Waste #7 – Defects

AND a Bonus Waste…

Waste #8 – People Utilization

We’ve examined the first six Wastes, with an eye toward understanding them and with suggestions on reducing them. I hope you’ve been able to apply some of these suggestions to your organization and hope you’ve already seen positive results.

This week we wrap up our attention and look at the seventh waste on our list, Defects.

Defects that take place during our construction process should be addressed and resolved. That’s the short story. But let’s first look at why we may be incurring defects.

Defect Causes

  • Untrained workers performing work
  • Workers are in a hurry to get in and get out
  • Work is performed without a leader’s or crew’s huddle
  • Crews never quite got the actual drawings or specs
  • Poor material from supplier
  • Crew using the wrong tools or equipment (or poorly maintained tools or equipment)
  • Apathy, ignorance, or just flat-out bad attitude by workers
  • Workers are at end of multiple 60-70 hour work weeks

As you can see from the list many defect causes can be eliminated through better planning or organization. For example, having a training plan that takes low-skilled workers and formally trains them to complete tasks, use tools in the right manner, and operate equipment safely can prevent a worker making unnecessary mistakes.

Resolving most defects, however, requires more of the problem-solving route. The goal should always be to correct any defect or defective process “once and for all.” Short of providing an in-depth presentation on preventing quality defects in both work processes and actual construction results, let me share a few defect-prevention techniques.

Defect Prevention

1. Discuss Work Process to Be Completed with Workers who will Be Completing It

No surprise here, or there shouldn’t be. It’s always a quality idea to visit with your workers prior to their beginning their work tasks for the day. The time to discuss task completion and address any potential quality issues or difficulty I call the “crew huddle.” Please see more discussion on Huddles in previous articles.

2. If Needed, Line-out the Order of Work Process for Clarity

This is probably not followed by many contractors but I highly recommend the execution of a documented work process on any job where there are questions, obstacles or challenges that we know about. Also, anytime you have less-experienced workers or leaders it’s probably a great idea to provide such greater instruction to those in need.

3. When a Defect Is First Found…Apply Fast and Safe Correction

The goal here is rather obvious…get the job completed! You may need to make some dramatic improvements or changes to fix the defect but that’s your first point of action…so do it!

4. Discuss Possible Causes for Defect (Root Cause Identification) with Those Who Were Engaged with Defect

You must know what you are dealing with before applying any solution. You may need a short-term “band-aid” to get you through a period of finding the root cause, but work hard to gain a clear understanding before taking the right correction effort.

5. Upon Solution, Create a Learned Lesson

Whenever you have fixed a defect that especially costs you time and money (and what defect doesn’t?), be sure to create what I call a Learned Lesson. This might be a document, a new SOP, or a presentation for your entire company to make sure that why the defect was realized never happens again!

While construction is both a science and an art, defects are often realized when the “science” is not followed or the “art” was not thoroughly researched before doing. Allowing defects, the same defects, to exist is not only poor business…it’s almost criminal for the contractor.

The Seven Wastes are real to contractors. Not addressed quickly and appropriately can drive a contractor crazy. Keep the upper hand on controlling the negative consequences for any of the Seven Wastes and recognize that you will need a plan to address.

Don’t shoot from the hip! You and your company are better than this.

Think Lean Contractors!

Brad Humphrey  

© 2013 Brad Humphrey, Pinnacle Development Group/The Contractor’s Best Friend™

(Special Note: While this series completes addressing the Seven Wastes, there is one additional waste that has been added in recent years and it’s called People Utilization that I’ll address next week in the final installment of this series!)

 

 