<?xml version="1.0" encoding="UTF-8"?><!-- generator="wordpress/2.3.3" -->
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	>
<channel>
	<title>Comments on: World of Concrete Wrap-up</title>
	<link>http://www.forconstructionpros.com/interactive/2008/01/30/world-of-concrete-wrap-up/</link>
	<description>Bringing you the voice of the construction equipment owner.</description>
	<pubDate>Sun, 22 Nov 2009 09:51:49 +0000</pubDate>
	<generator>http://wordpress.org/?v=2.3.3</generator>
		<item>
		<title>By: eos 7d</title>
		<link>http://www.forconstructionpros.com/interactive/2008/01/30/world-of-concrete-wrap-up/#comment-34707</link>
		<dc:creator>eos 7d</dc:creator>
		<pubDate>Wed, 04 Nov 2009 03:59:32 +0000</pubDate>
		<guid>http://www.forconstructionpros.com/interactive/2008/01/30/world-of-concrete-wrap-up/#comment-34707</guid>
		<description>I take long to find content and information like this thank you</description>
		<content:encoded><![CDATA[<p>I take long to find content and information like this thank you</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Darren Innes</title>
		<link>http://www.forconstructionpros.com/interactive/2008/01/30/world-of-concrete-wrap-up/#comment-623</link>
		<dc:creator>Darren Innes</dc:creator>
		<pubDate>Wed, 06 Feb 2008 03:25:47 +0000</pubDate>
		<guid>http://www.forconstructionpros.com/interactive/2008/01/30/world-of-concrete-wrap-up/#comment-623</guid>
		<description>Looking for a designated hoisting system for materials and tables without relying on the crane? Have a look at the Consep Formwork Hoist. Crane is only required for installation and removal, hoist services top 4 - 5 levels under construction and climbs the building using its own drive system perfect for any building over 8 levels or more above ground. A more efficient and safer way to move formwork materials. For more information visit www.consep.com.au and follow construction hoist link or email dinnes@consep.com.au.</description>
		<content:encoded><![CDATA[<p>Looking for a designated hoisting system for materials and tables without relying on the crane? Have a look at the Consep Formwork Hoist. Crane is only required for installation and removal, hoist services top 4 - 5 levels under construction and climbs the building using its own drive system perfect for any building over 8 levels or more above ground. A more efficient and safer way to move formwork materials. For more information visit <a href="http://www.consep.com.au" rel="nofollow">http://www.consep.com.au</a> and follow construction hoist link or email <a href="mailto:dinnes@consep.com.au">dinnes@consep.com.au</a>.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
