1. Select the right formwork. Formwork, the temporary or permanent molds used to hold wet concrete until it sets, is a crucial element in concrete construction. The selection of formwork greatly affects the schedule, labor requirements, quality and total cost of a project. Because conditions vary for each individual project, there is no simple formula for choosing the right formwork supplier or system. Formwork typically accounts for 40-to-60-percent of the total cost of a buildings structural concrete frame. For concrete walls, the cost can be in the 50-to-60-percent range. These percentages include the cost of material and labor, with the largest cost for labor. It is important to analyze labor costs thoroughly, as this is the bigger number and reducing this number will have a much greater impact on bottom-line costs.
To help determine the most efficient solution for a project, a contractor will evaluate several forming systems. Simply stated, a contractor has two choices: an inexpensive forming material that is labor-intensive or a forming system that while costing more, provides high productivity, built-in safety features and is more labor efficient. Other factors the contractor will evaluate when choosing a formwork system include:
2. Get involved early. Contact formwork suppliers at the very early design stage of the project. This can allow for as much information as possible to be incorporated into the bid documents, which will provide a more accurate cost to the owner. Formwork suppliers can advise on sizing structural concrete members to meet standard form dimensions. And, because major form suppliers typically are involved in a large number of projects in a wide variety of construction markets, they can draw upon their resources to suggest formwork means and methods. Also of importance is to ask concrete forming contractors to be involved early in the design stage of the structure. They are ultimately the people who will be physically building the structure and can provide a tremendous amount of knowledge as to the most economical means and methods.
3. Know when to purchase and when to rent. Another consideration is whether to purchase or rent a system. This decision should be based on the duration of the project and the overall strategy of the company. Typically, if a form system has to be rented for more than 8 to 10-months, purchasing the system might be more economical. However, along with the purchase of a system, there are additional costs such as maintenance and storage. Some formwork companies, however, offer services for customers who purchase their equipment. The quality of the product also must be considered in the decision-making process. Steel-framed wall formwork with standard plywood facing will require more maintenance and repair throughout the life of the form than hot-dipped galvanized steel frames with specially manufactured plywood designed for longer life.
4. Ensure proper access. Proper access is a really important component of formwork use at a worksite as it affects the schedule, budget and safety. Workers must be able to get to the workplace using safe horizontal and vertical access routes. Ladder systems, such as Dokas Ladder System XS, designed as integral parts of the overall formwork system allow safe access to various points on the formwork.