ForConstructionPros.com

Article

  

Features

Bookmark PageBookmark Page Most Read Stories TodayMost Read Most Emailed Stories TodayMost Emailed + -
Updated: April 7th, 2009 01:04 PM GMT-05:00

Contractors Working in Non-attainment Zones Must Seek Out Technology to Meet Local Engine Emissions Requirements - Win Work in Non-attainment Zones

John Deere PowerTech Plus
This 644H wheel loader is equipped with a new PowerTech Plus 6.8L engine as part of the John Deere Tier Up repower program.
Aftertreatment solutions
Aftertreatment is a possible solution for late-model equipment where it is economically feasible.
Cummins desel particulate filter
To meet local requirements, equipment may be fitted with aftertreatment devices such as this Cummins diesel particulate filter.
Tier IV technology
Tier IV technology offers many benefits that may justify a repower.

Curt Bennink
By Curt Bennink
Senior Field Editor

At one time, meeting diesel exhaust emissions requirements was a burden placed mainly on manufacturers of new equipment. But as local air quality districts strive to come into compliance with mandates in the Clean Air Act to conform to National Ambient Air Quality Standards, emissions from existing equipment in contractors' fleets has been targeted.

In most metropolitan areas, regions that exceed minimum air quality standards for any one or a number of pollutants are classified as non-attainment zones. In these zones, the federal government can withhold highway funding, and state or local legislatures can enforce their own requirements to reduce pollutants more quickly. Since not all non-attainment zones are dealing with the same pollutants or severity of pollutant levels, a patchwork of local regulations has sprung up. In the case of diesel engines, the main pollutants generated are nitrogen oxide (NOx) and particulate matter (PM). Local reductions of these pollutants will continue to escalate into the foreseeable future. While more modern fleets may conform to local requirements, many of the older fleets may not.

So what does this mean to you?
If you plan to work in a non-attainment zone - which includes many of the metropolitan areas across the U.S. - you may need to conform to these emerging requirements. In addition, many project owners are putting their own emissions restrictions into bids as part of the green building movement.

"Emissions requirements will be in bids, and if it is not considered up front, it can turn a profit into a big loss," says John Bartz, emission solutions manager, Volvo Construction Equipment. "There have been contractors and subcontractors prohibited from sites due to not having the required emissions equipment. This is not a problem that gets fixed overnight."

Compounding the problem is the fact that rules in each non-attainment zone can vary. "This can lead to a lot of confusion for the contractor as there is no consistency," says Bartz. "As a manufacturer, we are always listening to our customers and to what is going on in the market. Never bid blind, and use all the contacts you have to gain a full understanding of the regulations. State or city officials are usually very helpful in explaining what is required. After that, your Volvo dealer can help identify what the best path is for a specific piece of equipment."

1 2 3 4 5 6 next
[Get Copyright Permissions] Click here for copyright permissions!
Copyright 2009 Cygnus Business Media