Durall Industrial Floor introduces the No-Wait epoxy seal for fresh concrete.
  • Special technology produces a finished covering without waiting 28 days for the concrete to fully cure
  • Colored and decorative topcoats can go on without danger of lifting soon after No-Wait is applied
  • No-wait is water-based, so no drying time is required between cleaning and application
Request More Information
Fill out the form below to request more information about No-Wait epoxy seal
Latest