Cimline Pavement Maintenance Group

4-ton Asphalt Optimizer

The 4-ton-capacity Asphalt Optimizer features a diesel fired, self-priming 105,000-btu burner with electronic ignition to heat the hopper chamber without applying direct flame.

  • 4-in. tube near the top of the hopper disperses heat throughout the load
  • 26-gal. fuel tank provides for up to 72 hours of heating
  • Digital controller with temperature readout monitors temperature in 1° increments
  • Easy opening top doors for loading hot-mix asphalt
  • Tandem torsion axles rated at 15,000 lbs. provide a lower profile for more stable towing

Loading

Loading

Loading

Loading

Loading

Loading

Loading

Loading

Loading

Loading

Loading