“Go Early Technology” from AC•Tech

Get Photo 2 5412186c7f01c

Installing AC•Tech  2170 Vapor Reduction Systems with its patented “Go Early Technology” three-to-five days after a concrete slab has been poured, adds benefits to the project. By doing this, work crews are able to get on the freshly cured subflooring quicker and therefore, finish the job ahead of its projected schedule.

  • Prevents the slab from curling or cracking
  • Eliminates the need and subsequent expense of concrete finishing
  • Enhances the durability of the concrete slab by providing a topcoat that is resistant up to 14,000 psi
  • “Go Early Technology” allows EVERY trade involved to get to task sooner, speeding up EVERY process
  • Ensures slab cleanliness with a non-porous surface - disallowing cutting oil stains to react to adhesives leading to floor failure
  • Apply before walls are erected to ensure the entire slab will be protected from moisture
  • Compatible with most all finished flooring and coating systems
  • 15-year material and labor warranty

Video: AC Tech Go-Early Technology Fast Tracks the Concrete Curing Process

Companies in this article
Request More Information
Fill out the form below to request more information about “Go Early Technology” from AC•Tech
Latest