Astec offers the new second-generation design of the Double Barrel Green system.
- Simpler control - all valves open at the same time
- Minimal hot oil jacket
- No AC Foaming Valves to maintain
- System does not retain pressure once AC flow stops
- Self-cleaning water injection valves
- Water injection valves may be removed and replaced without removing the front cover
- Visual flow indicators allow flow through each water injector to be confirmed
- Standard for both the Double Barrel Green System and for the Green PacT warm mix systems