Video: See the Miniveyor in Use on Beach Restoration Project

MiniveyorUSA moved 1,500 tons of sand 150 ft. to a beach front to repair erosion issues.

Access Construction Equipment provides a unique solution for this Florida beach restoration. MiniveyorUSA moved 1500 tons of sand 150 feet to beach front to repair erosion issues. The job was completed in 4.5 days using minimal manpower as compared to the estimated three week minimum using conventional methods and far more workers to preform the backbreaking job. When the job was done, MiniveyorUSA was picked up and removed from the site leaving no footprint to repair.

Latest