Astec's Green Pac warm mix system injects water to produce a foamed warm mix asphalt.
• No smoke and no smell
• Run higher percentages of recycle with a standard grade of asphalt
• Reducing the temperature just 50°F, results in using approximately 14% less fuel and a corresponding 14% increase in production (greater temperature reduction results in bigger fuel savings)
• Improves workability - the foamed liquid asphalt coating has a lower viscosity
• Retrofit to continuous mix and batch plants from any manufacturer