The video entitled “Reaching New Heights” uses a combination of time-lapse footage, aerial photography and behind-the-scenes action shots to document the steps involved in building MidAmerican Energy’s first concrete wind turbine tower, located at the company’s Adams wind farm in Adams County, IA. At 379 ft. from ground to hub, the concrete turbine is more than 100 ft. taller than its neighboring turbines constructed with steel towers.
[VIDEO] MidAmerican Energy Company Assembles 379-ft. Concrete Wind Turbine
Video documents the steps involved in building the company’s first concrete wind turbine tower, which it says is the largest land-based wind turbine ever built in the U.S.
Jun 7, 2016
Latest in Video Network
Who Said This Generation Doesn't Want To Work? | Watch FCP
October 6, 2026
How To Identify The Hardest Workers On A Jobsite | Watch FCP
October 2, 2026
Building a Future for Women in Construction | Watch FCP
September 30, 2026






![[Video] Kobelco Reaffirms Commitment to North American Market with Grand Opening](https://img.forconstructionpros.com/files/base/acbm/fcp/image/2016/06/default.5755be5ce4865.png?auto=format%2Ccompress&fit=crop&h=167&q=70&w=250)
![[Video] Kobelco SK210LC is First Excavator Model Assembled in North America](https://img.forconstructionpros.com/files/base/acbm/fcp/image/2016/06/default.5751d6319a6d1.png?auto=format%2Ccompress&fit=crop&h=167&q=70&w=250)












