
Astec surprised the industry with a late season drop of a brand new, redesigned, reengineered super screed. Created with contractor feedback, the EZR3 is engineered for balance, both in design and operation. Its rear-mount configuration enhances tractor stability and reduces the need for constant adjustments, keeping paving operations smooth and consistent across wider widths.
The company touts it as a "new standard" in paving performance.
Key Advantages for Contractors:
- Key Features of the EZR3 Screed Include:
- Balanced Design: Enhances tractor balance while boosting strength and durability.
- Rear-Mount Advantage: Screed and extension plates maintain uniform depth, reducing adjustment needs.
- Enhanced Stability: Supports wider paving widths with minimal deflection for smoother, flatter mats.
- Optimized Mat Quality: Maintains angle of attack even during full-width applications.
- Improved Ride Quality: Delivers measurable improvements in smoothness and texture.
- Material Visibility: Lower profile improves visibility of material flow for better control.
- Serviceability & Adjustability:
- Easily accessible adjustment points for on-the-fly texture and density control.
- Multiple rows of screed plate adjustment points for perfect leveling and extended lifecycle.
- Heating elements are replaceable without removing the screed plate. Industry-leading surface area extension slide bushings for maximum stability and longevity.
- Simplified single-stage extension design for easier parallel alignment and flatter pavements.
- Class-Leading Endgate: Free-floating design with narrow or wide width options and four runner configurations to suit diverse applications.
The EZR3 screed sets a new benchmark in paving performance for Astec—combining operator-driven engineering with Astec’s commitment to reliability and innovation. It’s a product that reflects the company’s ongoing focus on helping contractors achieve faster, smoother, and more consistent results on every project.
For more information, visit astecindustries.com




![Lee Boy Facility 2025 17 Use[16]](https://img.forconstructionpros.com/mindful/acbm/workspaces/default/uploads/2025/09/leeboy-facility-2025-17-use16.AbONDzEzbV.jpg?auto=format%2Ccompress&fit=crop&h=100&q=70&w=100)


![Lee Boy Facility 2025 17 Use[16]](https://img.forconstructionpros.com/mindful/acbm/workspaces/default/uploads/2025/09/leeboy-facility-2025-17-use16.AbONDzEzbV.jpg?auto=format%2Ccompress&fit=crop&h=167&q=70&w=250)




![Lee Boy Facility 2025 17 Use[16]](https://img.forconstructionpros.com/mindful/acbm/workspaces/default/uploads/2025/09/leeboy-facility-2025-17-use16.AbONDzEzbV.jpg?ar=16%3A9&auto=format%2Ccompress&fit=crop&h=135&q=70&w=240)







