Watch as a Genesis GDR 300 processes concrete columns containing rebar cages and lengths of rebar measuring about 1½-inches in diameter. The GDR was also used to remove the at-grade support columns and systematically drop sections of the building.
Genesis GDR 300 Quickly Separates Concrete from Rebar
Watch as a Genesis GDR 300 processes concrete columns containing rebar cages and lengths of rebar measuring about 1½ in. in diameter.
Jul 31, 2013
Latest in Attachments
FAE Launches RWL/SSL Wheel Saw for Skid Steers
September 30, 2025
Genie Adds New Safety Features for Boom and Scissor Lifts
September 29, 2025
CMC North America Launches 90-Foot Insulated Tracked Aerial Lift
September 25, 2025