Watch as a Genesis GDR 300 processes concrete columns containing rebar cages and lengths of rebar measuring about 1½-inches in diameter. The GDR was also used to remove the at-grade support columns and systematically drop sections of the building.
Genesis GDR 300 Quickly Separates Concrete from Rebar
Watch as a Genesis GDR 300 processes concrete columns containing rebar cages and lengths of rebar measuring about 1½ in. in diameter.
Jul 31, 2013
Latest in Attachments
LineWise Introduces Folding Guard Arm for Conductor Work
November 8, 2026
Using Intelligent Compaction Data as a Quality-Control Shield
October 16, 2026
Digging Into Trenchers
October 12, 2026


















