
The redesigned Bluelight LED cured-in-place pipe (CIPP) lining system features user-friendly enhancements and expanded capabilities that make it an optimal solution for the rehabilitation of laterals and small sewer pipes 3 to 10 in. in diameter.
- Specially formulated single-part resin only cures under light in the “blue” wavelength, giving installers longer working time between liner wet-out and curing
- Automated curing system pulls LED light head through the liner, curing the resin almost instantly (as fast as 5.4 fpm)
- Includes an intuitive touchscreen interface, interchangeable reels in 131- and 164-ft. lengths and three light head sizes including a new 3-in. light head
- Lightweight, ergonomic frame for easier maneuverability and portability
- Capable of navigating and repairing 45° and 90° bends and some transitions
- Bluelight system resin free of styrenes and VOCs, and the system meets or exceeds ASTM F1216
Fill out the form below to request more information about HammerHead Bluelight LED Cured-In-Place Pipe Lining System