Construction at 432 Park Avenue in Midtown Manhattan stopped briefly after a section of guardrail fell from a hoist near the top of the building. Construction resumed one day after the stop-work order was imposed. The 8-foot-long section of guardrail became dislodged from the hoist, which was at the 81st floor of the 96-story building. The guardrail landed in front of the main entrance of an occupied building across the street. Luckily, nobody was injured.
Construction Halted on NY Tower After Guardrail Falls 81 Stories
No injuries occurred after guardrail lands in front of an occupied building across the street from the construction site
Jan 20, 2015
Latest in Construction Safety
EarthCam Launches Command Watch24 for Enhanced Jobsite Security
December 7, 2025
SCANGRIP Rolls Out AREA 10 CONNECT Floodlight in North America
December 5, 2025
Reminder: Key Snow Thrower Safety Tips Ahead of Winter Weather
December 4, 2025



















