Just a few days before the SR 99 tunneling machine started tunneling under the Alaskan Way Viaduct, the Washington State Department of Transportation flew a video-equipped drone through the SR 99 tunnel to show Seattle Tunnel Partners’ construction progress. On an average day, the tunnel is bustling with construction. To avoid disrupting crews, this video was recorded in between regular work shifts.
[VIDEO] Drone Flies Through Seattle's SR 99 Tunnel Bertha is Digging
The Washington State Department of Transportation flew a video-equipped drone through the SR 99 tunnel to show Seattle Tunnel Partners’ construction progress before Bertha tunnel under Alaskan Way Viaduct
May 9, 2016
Latest in Video Network
Construction Mental Health Is a Safety Issue, Too | Watch FCP
September 24, 2026
Komatsu D175 Crawler Dozer Debuts at CONEXPO 2026 | Watch FCP
September 23, 2026
Building A Career, Not Student Load Debt | Watch FCP
September 19, 2026






![[VIDEO] Watch How 14,260 Concrete Segments were Made for Seattle Tunnel's Outer Wall](https://img.forconstructionpros.com/files/base/acbm/fcp/image/2016/08/default.57b481e44572a.png?auto=format%2Ccompress&fit=crop&h=167&q=70&w=250)
![[VDIEO] Watch Workers Change Cutting Teeth on Seattle Tunneling Machine Bertha](https://img.forconstructionpros.com/files/base/acbm/fcp/image/2016/07/default.57864fbecf578.png?auto=format%2Ccompress&fit=crop&h=167&q=70&w=250)












