FL Screed - Unshored Slab on metal deck
2 finishers operating the FL Screed for the first time screed off 140 yards on an unshored metal deck. Even with deflection, and after taking a 1000 elevation readings, produced overall FL 20, a +/- 1/4" floor.
Jul 24, 2013
Latest in Concrete Equipment & Products
SLABS Slab-on-Ground Design Tool for Concrete Floors
August 6, 2026
How To Read The Story Of Old Foundations
August 5, 2026











![Fod No Caption 74 A Tc M Cy Uy[1]](https://img.forconstructionpros.com/mindful/acbm/workspaces/default/uploads/2026/08/fod-no-caption74atcmcyuy1.vcSFiPTy0m.png?ar=16%3A9&auto=format%2Ccompress&fit=crop&h=135&q=70&w=240)








