Equipment
Rental
Concrete
Asphalt
Pavement
Technology
Business
Infrastructure
Workwear
Magazines
Newsletters
Sign In
New Equipment Directory
IRONPROS
Video Network
Magazine
Events
Podcasts
Premium Content
Webinars
Search: Page 7
Article
Blog
Company
Podcast
Product
Video
Whitepaper
Asphalt
Business
Concrete
Construction Technology
Equipment
Crane
Pavement Maintenance
Enter search phrase
Search
184 Results
Type: Article
Section: Equipment > Crane
Crane
750-Tonne Liebherr All-Terrain Gives Crane-Rental Firm Nationwide Reach
Northwest Crane Service has been able to expand its wind turbine maintenance work with its new LTM 1750-09.1 crane
February 27, 2014
Crane
Terex AC 700 All Terrain Crane Helps Restore The Pantheon
The Terex crane was used to lift and place the free standing scaffolding that will be used during the first phase of the Pantheon’s massive restoration project
February 10, 2014
Crane
Terex Superlift 3800 Lattice Boom Crawler Crane Erects Largest E-101 Wind Turbines
Terex crane lifts large wind turbines using less ballast and without an assist crane which helped shorten setup time and reduce transportation costs
January 13, 2014
Lifting Equipment
18 Terex Tower Cranes At Work in Denmark on One of its Biggest Construction Projects
Terex flat top tower cranes are being used to remove excavated tunnel material as well as lift new concrete and materials for the Copenhagen Metro City Circle Line project
November 25, 2013
Lifting Equipment
Solid Equipment Planning Saves Contractor Time and Money
Using the right equipment allowed contractor to complete a five-week job in just 10 days
November 13, 2013
Crane
Liebherr Cranes Send Paris Transport Hub Back to Nature
Cranes aid in placing the structure and materials on the massive Canopee Les Halles renovation project in the heart of the city.
October 31, 2013
Crane
Three Terex Cranes Lift Tied-Arch Bridge Onto Concrete Pillars
Three crane providers and three Terex cranes helped close a gap in the A23 motorway expansion project in Germany
October 21, 2013
Lifting Equipment
Things are Just Ducky in Pittsburgh
Grove TMS9000 positions artist's 40-ft.-high rubber duck onto the Allegheny River
October 14, 2013
Crane
Terex Superlift 3800 Crawler Crane Erects Wind Turbines in Germany
German contractor puts Terex Superlift 3800 to work on its first project at a Germany wind park
September 16, 2013
Crane
Nine Terex Flat Top Cranes Placing Steel, Concrete at Paris Construction Site
Terex cranes are being used to hoist and place 1,212 tons of steel and placing and pouring 600,340 cubic feet of concrete for a Paris outlet center building’s framework
August 12, 2013
Crane
Hawaii Wind Farm Projects Succeed With Narrow Track Terex Crane
Narrow roads, small turbine pads and environmental concerns meant the Kaheawa Wind project needed just the right crane for turbine construction
July 22, 2013
Lifting Equipment
Jekko Minicrane Aids Statue of Liberty Renovation
The compact and versatile SPD360 Jekko minicrane allowed for work in tight areas of the monument's foundation and easily adapted to the irregular footing.
July 16, 2013
Crane
Self-Erecting Tower Crane Helps Restore Ancient Cambodian Mountain Temple
Terex self-erector scrambles up to remote location to lift stone blocks to a max. radius of 78 ft. in shoring up and rebuilding ninth-century temple
July 1, 2013
Crane
Telescopic Terex Crane Picks 92 Tons to 262 ft. Erecting German Wind Turbines
German contractor relies on a Terex AC 1000 all-terrain crane to quickly adapt to different-sized towers at multiple locations
June 17, 2013
Crane
Two Terex Crawler Cranes Work in Tandem Constructing 15 Wind Turbines at Iowa Wind Farm
Cranes were erected at different heights to help lift different sections of the turbines, completing all 15 turbines within one month
May 27, 2013
Crane
Four Linden Comansa Tower Cranes on the Job At FIFA, Olympic Soccer Stadium
The cranes are being used to mount the metal structures of the tiers of seats and assembling the ceiling’s steel cables
April 8, 2013
Lifting Equipment
Manitowoc Boom Raising System Installs 19 Wind Turbines
Taller towers required the use of a new system providing longer boom lengths for wind applications without the need of an assistant crane
February 25, 2013
Crane
Terex Crawler Crane Lifts Steel Footbridge into Place Over Busy Autobahn Freeway
A Terex CC 2500-1 crawler crane dealt with space constrictions and a tight time frame to lift and place a 584,225-lb., 230-ft. steel footbridge over an Autobahn freeway
February 11, 2013
Previous Page
Page 7 of 11
Next Page